
LINAC Building (Entrance side)
(October 22, 2007)
|

LINAC Building
(October 23, 2007)
|
|

LINAC Building
(October 16, 2007)
|

LINAC Building (DTL, SDTL)
(October 16, 2007)
|
|

The upstream of LINAC Building
(June 6, 2007)
|

The downstream of LINAC Building
(June 6, 2007)
|
|

Linac (RFQ)
(June 1, 2007
|

Linac (DTL)
(June 1, 2007)
|

Linac (SDTL)
(June 1, 2007)
|

DTL on the 2nd basement level of Linac Building
(February 2, 2007)
|

DTL on the 2nd basement level of Linac Building
(February 2, 2007)
|
|

LINAC Building
(February 2, 2007)
|

LINAC Building
(February 2, 2007)
|
|

Liniac and 3GeV Synchrotron
(December 11, 2006)
|
|
|

Electromagnets in the downstream on the 2nd basement level of Linac Building
(September 5, 2006)
|

DTL on the 2nd basement level of Linac Building
(September 5, 2006)
|
|

Linac Building
(May 15, 2006)
|

LINAC Building
3GeV Synchrotron Building
Fill of 3NBT
(September 5, 2006)
|
|

DTL at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(March 6, 2006)
|

RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(March 6, 2006)
|

RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(March 9, 2006)
|

Klystron on the 1st floor of Linac Building
(December 15, 2005)
|

Klystron on the 1st floor of Linac Building
(December 15, 2005)
|
|

DTL at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
|

DTL at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
|
|

RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
|

RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
|
|

Quadrupole magnet in Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
|

Quadrupole magnet in Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
|
|

Quadrupole magnet in L3BT
(From the downstream to the upstream)
(December 15, 2005)
|

Bending magnet at the downstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
|

Debuncher in Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
|

Linac Building
(September 30, 2005)
|
|
|

Quadrupole magnet in Accelerator Tunnel on the 2nd basement level of Linac Building
(August 23, 2005)
|

Quadrupole magnet in Accelerator Tunnel on the 2nd basement level of Linac Building
(August 23, 2005)
|

From Accelerator Tunnel on the 2nd basement level of Linac Building to L3BT
(August 23, 2005)
|

RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(August 23, 2005)
|

RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(August 23, 2005)
|
|

Klystron on the 1st floor
of Linac Building
(August 23, 2005)
|

Klystron on the 1st floor
of Linac Building
(August 23, 2005)
|
|

Linac Building and
Linac Power Substation
(July 27, 2005)
|
|
|

Power source room for Klystron
on the 1st floor of Linac Building
(June 16, 2005)
|

Klystron gallery
on the 1st floor of Linac Building
(June 16, 2005)
|
|

Accelerator tunnel on the 2nd basement level of Linac Building
(June 16, 2005)
|

Accelerator tunnel on the 2nd basement level of Linac Building
(June 16, 2005)
|
|

Middle tunnel on the 1st basement level of Linac Building
(June 7, 2005)
|

Accelerator tunnel on the 2nd basement level of Linac Building
(June 7, 2005)
|
|

(Apr. 14, 2005)
|

Linac Building
(June 1, 2005)
|

Linac Building
and Linac Power Substation
(June 7, 2005)
|

(Feb. 23, 2005)
|

(Feb. 23, 2005)
|
|